The “Resources” section of reports provides information about the usage of various resources in production processes.
1. Resource Usage History
This report shows all operations with a specified resource for a selected period. Each operation displays:
-
Date
-
Quantity
-
Unit cost
-
Total cost
-
Status (actual or planned)
-
Comment (related transaction)
Available settings:
-
Resource selection
-
Time period
-
Option to include planned operations
2. Resource Turnover
This report displays the total usage of resources for the selected period. For each resource, it shows:
-
Resource name
-
Quantity
-
Unit cost
-
Total cost
Available settings:
-
Time period
-
Resource categories
-
Option to include planned operations