Home Production Adjusting Usage

Adjusting Usage

Last updated on Oct 19, 2026

When your actual material consumption doesn't match your bill of materials (for example, because of material defects, process improvements, or component substitutions), you can adjust the usage to reflect what really happened.

Making Usage Adjustments

At the bottom of any production card, click Adjust usage. You'll see a dialog with two tabs: Components (for materials and products) and Resources.

Adjusting Materials and Products

The Components tab shows everything consumed in this production run:

  • Planned usage — what your bill of materials calls for

  • Actual usage — what you really used (starts out matching the planned amount)

  • Location — which storage location the items came from

  • Variance — how much over or under you used

Just update the Actual usage field with the real number, and the variance calculates automatically. Positive numbers (like "+0.8 sq m") mean you used more than planned; negative numbers (like "-0.4 sq m") mean you saved material.

Need to add something that wasn't in the original bill of materials? Click + Add row, pick the item, and enter how much you used.

Adjusting Resources

Switch to the Resources tab to record actual labor hours, machine time, or other production resources. Update the Actual usage field to see how it compares to what you planned.

You can also add resources that weren't originally planned by clicking + Add row.

Saving Your Changes

Click Save when you're done, and your adjustments will flow through to all your reports and cost calculations. Changed your mind? Just click Close to cancel.

Practical Examples

For example, say you planned to use 4.2 sq m of lumber, but defects during production required an additional 0.8 sq m. In the usage adjustment dialog, enter actual usage of 5 sq m.

For example, say you planned to use 2.4 sq m of fabric, but optimized cutting needed only 2 sq m. Enter actual usage of 2 sq m, and the system will show savings of -0.4 sq m.

For example, say you planned 5 hours of CNC machine time, but the job actually took 6 hours. On the Resources tab, enter 6 hours, and the system will record overconsumption of +1 hour.